Two Girls Creek Hydroelectric Project

Willamette River Basin; Two Girls Creek, Linn County, Oregon

Project Profile

This project has the potential for changes to water quality that may affect ESA-listed fish. The proposed project would include installation and operation of hydroelectric turbine(s) capable of producing as much as 5MW of electricity on a previously unaltered stream in the South Santiam basin above Foster Dam.

Listed Species

Upper Willamette River Chinook

Upper Willamette River steelhead

Licensee

Pacific Green Power, LLC

FERC Relicensing Status

Pacific Green Power, LLC, filed an application for a preliminary permit to study the feasibility of this project in April 2011. The project is following the Integrated License Process.

Resources

Federal Energy Regulatory Commission

FERC eLibrary: Docket #P-14145

No NOAA Fisheries Biological Opinion