Okanongan PUD would use the existing Enloe Dam to divert water into a newly constructed powerhouse on the left bank (looking downstream) of the Similkameen River. NOAA Fisheries did not require fish passage at this project because there was little evidence that anadromous fish occurred historically above the falls located downstream of Enloe Dam.

Listed Species

Upper Columbia River steelhead

Licensee

Public Utility District No. 1 of Okanogan County

FERC Relicensing Status

The project is working through the federal licensing process. FERC expects to issue a new license in late 2013 or early 2014.

Resources

Federal Energy Regulatory Commission

FERC eLibrary: Docket #P-12569

No NOAA Fisheries Biological Opinion